steel1man Beach Fanatic Oct 27, 2015 #1 Sowal summits final design plans for the traffic signal to FDOT..Now FDOT will decide if the traffic signal is needed and then approve for construction.
Sowal summits final design plans for the traffic signal to FDOT..Now FDOT will decide if the traffic signal is needed and then approve for construction.
Matt J SWGB Oct 27, 2015 #2 It's based on historical traffic counts for the intersection, I wouldn't hold my breath. By the time they get around to it the bridge will be open.