The first step of creating a #SouthWaltonConnector road from 30a to Hwy 98 was approved 4-1 by the Walton County Commissioners. Step 1: approving $597,780 for professional design and engineering services. #SouthWalton @WMBBTV
The first step of creating a #SouthWaltonConnector road from 30a to Hwy 98 was approved 4-1 by the Walton County Commissioners. Step 1: approving $597,780 for professional design and engineering services. #SouthWalton @WMBBTV
Bingo!!!!!!!!!Is it a waste of money because you don't want the road or think it won't be built?
Horse done left the barn and trottin'.Bingo!!!!!!!!!
Yes I think we'd be better served by adding turn lanes at existing signals on 30A and 98, and adding additional signals at danger points like next to 98 BBQ.When traffic backed up from 395/30A to the Tom Thumb, people cried for another connector.
While traffic can still back up at times, the traffic signal has effectively alleviated most of it, or at least the times I've been through it seems to have solved a lot of the problem.
If customary use isn't upheld, many of our visitors are going elsewhere.
So, there is no need for another connector anymore.