ecopal
Beach Fanatic
The following excerpt from the Board of County Commisssioner meeting minutes states unequivocally that any sand less than the 7.2 standard placed after August 1, 2005 has to be removed at homeowners or contractors expense.
The sand just tested by the county last week that was dumped after August 1 ( witnesses report seeing some dumped last week) was tested at 6.2 (at best after being microwaved to maximally dry it out) and clearly does not meet the 7.2 standard.
an excerpt from Walton County Board of Commissioners AUGUST 1, 2005-SPECIAL MEETING
"Motion by Commissioner Jones to remove any material that does not meet the 6.2 standard as set forth by staff. The motion also included raising the standard to 7.2, and requiring that any material used was to be in accordance with the typical section for shoreline stabilization as presented by Mrs. Blackshear, capped with a minimum of three feet of sand*with a value of 8.1.*This is to be effective as of August 2, 2005. Any material placed on the beach prior to this meeting, that met the standard of 6.2 when approved, would be considered an allowable use for emergency stability fill.* Any material that was placed on the beach prior to this meeting and*was not in compliance with the 6.2 standard must be removed at the contractor's or homeowner?s expense.* Any material placed on the beach, subsequent to this meeting, that does not meet the 7.2 standard would not be an allowable use and*would have to be removed at the contractor's or homeowner's expense.*Commissioner Meadows seconded the motion."
read all the minutes at http://minutes.co.walton.fl.us/
The sand just tested by the county last week that was dumped after August 1 ( witnesses report seeing some dumped last week) was tested at 6.2 (at best after being microwaved to maximally dry it out) and clearly does not meet the 7.2 standard.
an excerpt from Walton County Board of Commissioners AUGUST 1, 2005-SPECIAL MEETING
"Motion by Commissioner Jones to remove any material that does not meet the 6.2 standard as set forth by staff. The motion also included raising the standard to 7.2, and requiring that any material used was to be in accordance with the typical section for shoreline stabilization as presented by Mrs. Blackshear, capped with a minimum of three feet of sand*with a value of 8.1.*This is to be effective as of August 2, 2005. Any material placed on the beach prior to this meeting, that met the standard of 6.2 when approved, would be considered an allowable use for emergency stability fill.* Any material that was placed on the beach prior to this meeting and*was not in compliance with the 6.2 standard must be removed at the contractor's or homeowner?s expense.* Any material placed on the beach, subsequent to this meeting, that does not meet the 7.2 standard would not be an allowable use and*would have to be removed at the contractor's or homeowner's expense.*Commissioner Meadows seconded the motion."
read all the minutes at http://minutes.co.walton.fl.us/
