• Trouble logging in? Send us a message with your username and/or email address for help.

Big Redfish Bridge Construction

New posts

Terp22

Beach Comber
Work is to start soon-see bellow. Another article was in the NWFDN today

Walton County
Public Works Division

Engineering Department


97 Montgomery Circle, DeFuniak Springs, Florida 32435​

Phone 850-951-0551 Facsimile 850-892-8402







BIG REDFISH LAKE PEDESTRIAN BRIDGE​


The construction of Big Redfish Lake Pedestrian Bridge is an American Recovery and Reinvestment Act project consisting of a pedestrian bridge over Big Redfish Lake within CR-30A right-of-way. The center of the crossing includes two weathered steel pedestrian bridges that are 8 feet wide. The approaches to the steel span will require construction of timber boardwalks that are also 8 feet wide. Additional components include concrete flumes for drainage and riprap.

Floridian Construction has been awarded the contract. Work is currently scheduled to commence by no later than January 25, 2010. The existing multi-use path will be closed during construction. Expect intermittent lane closures of CR 30A.

Project contact: Nolan Baker
CDG Engineers & Associates
630 Baldwin Ave.
DeFuniak Springs, FL 32435
Office: 850-892-0225
Email: nbaker@cdge.com
 
Timpoochee Trail 30A

I was wondering what I was missing - sounded like a LOT of pedestrian traffic there! :blush:
It's the multi-use path (bike path) that will utilize this new bridge. It will keep cyclists, runners, roller bladers, etc off the road and be much safer.
 
New posts


Sign Up for SoWal Newsletter












                               
Back
Top