• Trouble logging in? Send us a message with your username and/or email address for help.

Daily Giant 30Ahole report

New posts

steel1man

Beach Fanatic
Walked by today main activity @ 7:30AM front end loader scraping sand off road and dumping
Into the Big Hole. Appears to have added several
Loads of dirt/sand dumped into the hole in the last couple of days. Equipment on site Loader,
Packer, large cherry-picker. Activity scale 4
 
Go to "Scenic 30A thread on "All About SoWal" and read the post regarding construction of a Bailey bridge.
 
If they are filling in the hole then a bailey bridge doesn't sound like the option they are going with. Hope the protesters will be happy with the patch job they get.
 
I would think that no matter what comes next, they are going to start by filling in the hole.
 
30A Big hole report #2

8:00AM 9/5/13 two dozers added . Yesterday late Walton Sheriff truck lights flashing and Gas
Truck where present. This morning hole is 80%
FILLED. Packer is set to continue packing the
New fresh dumped dirt. They are thinking something but I have no idea what? Looks like a patch.
 

Attachments

  • image-596208714.jpg
    image-596208714.jpg
    80.7 KB · Views: 335
  • image-3894994357.jpg
    image-3894994357.jpg
    75 KB · Views: 342
  • image-2592731207.jpg
    image-2592731207.jpg
    96.1 KB · Views: 351
Well, Loco, I guess then the County Commissioner who told me there was a Bailey bridge to be constructed either didn't know what she/he was talking about, had been totally misinformed or was lying, none of which I find plausible. Did someone change their minds? Possibly but the final result is still to be determined. I've cited my source, Loco, what's yours?
 
New posts


Sign Up for SoWal Newsletter












                               
Back
Top