The Walton County Coastal Dune Lake Berm Removal Project consists of using off road trucks to load and haul approximately 16,000 cubic yards of beach compatible sand and existing outfall pipes from nine dune lake outfalls to beach access locations and transporting the material to the CR-83 county pit. The hauling along the beach will be routed around nesting bird sites and some stretches as long as two miles will be required to reach the stockpile areas.The contractor will be required to coordinate with DEP, ACOE, and Parks and Recreation facilities directors for removal of the material and will be responsible for coordinating with shore bird nesting advisors throughout the project. The project will start April 1, 2011 and must be completed by April 29, 2011 and work on beach must be completed no later than April 30, 2011 and work not on beach must be completed no later than May 15, 2011, to meet Federal and State required deadlines. All bidders shall be General Contractors and shall be FDOT prequalified to preform the work.
The Walton County Coastal Dune Lake Berm Removal Project consists of using off road trucks to load and haul approximately 16,000 cubic yards of beach compatible sand and existing outfall pipes from nine dune lake outfalls to beach access locations and transporting the material to the CR-83 county pit. The hauling along the beach will be routed around nesting bird sites and some stretches as long as two miles will be required to reach the stockpile areas.The contractor will be required to coordinate with DEP, ACOE, and Parks and Recreation facilities directors for removal of the material and will be responsible for coordinating with shore bird nesting advisors throughout the project. The project will start April 1, 2011 and must be completed by April 29, 2011 and work on beach must be completed no later than April 30, 2011 and work not on beach must be completed no later than May 15, 2011, to meet Federal and State required deadlines. All bidders shall be General Contractors and shall be FDOT prequalified to preform the work.