• Trouble logging in? Send us a message with your username and/or email address for help.
  • Hello all! We will be performing a website & forum update soon. You may get logged out so now is the time to make sure your email address in your account is correct - go to your account to check it and update it now. Send us a message with your username and/or email address if you need help.

katrina cottages

New posts
For the smaller cottages, there is no reason why a fairly handy (skilled) person with a couple of skilled friends couldn't build one within a month. Not all are suited for that, but it is basically a sophisticated over-sized play house (actually, my SIL's dad is building a playhouse which is larger) with instructions.

Up to code, though? (Not challenging, just asking...)
 
Yes, if the kit is designed to code and stamped by an engineer, and I agree with SWGayboi, I would also use a professional electrician and plumber. If the plans are well-designed, those two costs should be nominal.

For the not-so-skilled, find you a GC on www.nahb.org

Mango, that $55 per sq foot is materials cost, not labor. From their website, "Prices for materials packages average $55 a square foot, but specific prices will vary by region."
 
I would assume the $55/sqft would be based on very basic finishes. If you building this as a guest house as the thread started with, and you wanted to match your existing homes finishes it would probably go up considerably.
 
The price of the Katrina cottages varies by area and does not include the foundation costs. Lowe's does quite the little dance when questioned about pricing details.

I think Dwell has a line of pre-fab homes that meet local codes that might be a more interesting and less $ alternative.
 
New posts


Sign Up for SoWal Newsletter












                               
Back
Top