• Trouble logging in? Send us a message with your username and/or email address for help.
  • Hello all! We will be performing a website & forum update soon. You may get logged out so now is the time to make sure your email address in your account is correct - go to your account to check it and update it now. Send us a message with your username and/or email address if you need help.

Little Redfish bridge

New posts

asf0531

Beach Crab
How is construction going on this? Is the bike lane still open? Will be down in March and hate that we will have to go 98 to Grayton.
 
I'd be interested in the timeline. As usual, the Seaside half marathon plans on heading right down 30A. They buttoned up the last bridge they replaced right before the race. Assuming there will be the same push or a plan B by the race organizers.
 
Bike path is still closed. The bridge decking is down and they are working on the road leading up to the bridge. I heard they were supposed to be done by the end of the month.
 
New posts


Sign Up for SoWal Newsletter












                               
Back
Top