Kurt
Admin
Walton County, FL - Home Page
The Big Redfish Lake crossing consists of three bridges total. Prior to construction on this crossing the contractor shall install a turbidity barrier and silt fences as required to prevent runoff from entering Big Redfish Lake. The bridge crossing will be constructed over wetland areas. The approach bridges include one (1) 50 fifty- foot bridge section and one (1) 112- foot bridge section. These timber bridges utilize dimensional lumber that should be readily available. The piling installation, piling cap and abutment construction is also included in this contract along with two (2) 150 linear foot prefabricated steel bridges.