Sally
Beach Fanatic
The county awarded a $155,340 contract to Contech Bridge Solutions Inc., of Fort Payne, Ala., to construct two steadfast steel pedestrian bridges over Eastern and Oyster lakes. The spans will be of similar construction to the bridge already in place over Draper Lake, and will reduce the hazards of combining vehicular and foot traffic. A bid sheet estimates the spans will be delivered 12-14 weeks after a one-third deposit is received, and they should be operational less than a month after delivery.