Scenic 30a Open - Draper Lake Bridge Construction Complete

New posts
It's permanent. Sorry. [not sorry]
 
So how long will it take for the stop light @ 83 and 98 to come down? Please don't say it' permanent.
Please note that the temporary signal located at the C.R. 83/U.S. 98 intersection will be switched to “Flash Mode” on March 2, 2016, and will remain so until Big Redfish Lake Bridge is constructed. At that time the signal will be allowed to operate for maintenance of traffic during the construction activities. We are pleased to report the Draper Lake Bridge Project has opened ahead of schedule.

The Florida Department of Transportation will conduct a signal warrant analysis in the near future to determine if a permanent signal is warranted at the U.S. 98/C.R. 83 intersection.
 
The Florida Department of Transportation will conduct a signal warrant analysis in the near future to determine if a permanent signal is warranted at the U.S. 98/C.R. 83 intersection.
 
As a rule, I prefer more lights but with higher speed limits and good merging lanes.
 